Our sheds are built to last!

 

Using only kiln-dry 2x4, 1/2" plywood and aspenite, the sheds are built in panels in our workshop.

 

The floor is studded at 12" spacing and covered with the 1/2" plywood for a sturdy and durable base.

 

Aspenite is used for the walls and roof. We install the double dutchlap vinyl siding and shingles are on your premise.

 

The wood used for trims and fascia are made of G1S 1/2" plywood cut to size and sanded down for a smooth finish. Mahogany or virola is used for the soffit.

 

We take pride in our work and are committed to give our customers the best quality and service for their money.

 

INSTALLATION -

 

It usually takes 1 - 2 days to completely install a shed.

 

We supply and put in place the 4" cement blocks before leveling the floor where the shed is to be located. We then bring in and install the wall panels and the trusses. Their the shingles go on following with the siding. Then we add door(s), windows & finally the trims which gives it a finished look. For the final touch, we put in the flower boxes and step. We bring in all the tools, tarp and even the garbage can, so when we leave there is no mess to clean up and no trace that we were even there except for your new shed.